Home
Is Solar Right For You ▾
The Case for Solar
Managing Risks
How to Get Started ▾
Permits and Zoning
Site Assessment
HOA & Deed Restrictions
Grid Interconnection
Your Solar Checklist
Financial Impacts ▾
Realistic ROI
Net Metering
Tax Incentives
Offsets vs Elimination
Home Insurance
Home Equity
Environmental Impact ▾
Carbon Footprint
Resilience
Sustainability
Solar Reality Check ▾
Cold Weather
Financing
Roofing
Warranty
Operations
Home
Is Solar Right For You ▾
The Case for Solar
Managing Risks
How to Get Started ▾
Permits and Zoning
Site Assessment
HOA & Deed Restrictions
Grid Interconnection
Your Solar Checklist
Financial Impacts ▾
Realistic ROI
Net Metering
Tax Incentives
Offsets vs Elimination
Home Insurance
Home Equity
Environmental Impact ▾
Carbon Footprint
Resilience
Sustainability
Solar Reality Check ▾
Cold Weather
Financing
Roofing
Warranty
Operations
Home
›
How to Get Started
› Your Solar Checklist
Your Solar Checklist
Phase 1: Preparation & Research
Gather at least 12 months of electricity bills to determine your average usage and help installers right-size your system.
Conduct an energy audit (LED lights, insulation, sealing windows) to reduce the size of your solar system.
Hire an independent roofer—not a solar salesperson—to inspect your roof. If replacement is needed within 5 years, do it before installing solar.
Check HOA restrictions and research your utility’s Net Metering policy.
Phase 2: Quotes & Comparisons
Solicit multiple quotes — aim for at least three proposals from reputable installers.
Vet installers for NABCEP certification, 3–5 years of local experience, and recent customer references.
Compare equipment, warranties, inverter types, and financial details including incentives.
Phase 3: Planning & Permitting
Installers perform a site assessment to measure your roof, check shading, and verify electrical panel capacity.
Installers submit building and electrical permit applications.
Installers file utility interconnection paperwork to legally connect your system to the grid.
Phase 4: Installation & Activation
Prepare for installation day by clearing access to your roof and electrical panel.
Installation typically takes 1–3 days including racking, panel mounting, and wiring.
Your local building department must approve the installation before activation.
Your utility must issue Permission to Operate (PTO) before the system is turned on.
Phase 5: Post-Installation
Notify your homeowners insurance company to update your policy.
Collect manuals, schematics, warranties, and your final signed contract.
Set up your system’s monitoring app to track production.
Schedule periodic maintenance checks for debris, wiring, and system health.